Projects

On Going Project

MARCH, 2017 Pa Cost International SAUDI ELECTRICITY CO.

REINFORCEMENT OF ZALLUM VILLAGE 33/13.8KV S/S
Render  re-Configuration and Re-Commissioning Services for the existing SCADA RTU at Zallum Village 33/13.8kV substation.

JANUARY, 2017 Al Gihaz SAUDI ELECTRICITY CO.

CONSTRUCTION OF NEW RAWABI 110/13.8KV S/S
Render  re-Configuration and Re-Commissioning Services for the existing SCADA RTU at KM-5 substation.

MAY, 2016 CONCO SAUDI ELECTRICITY CO.

RETROFITTING OF 13.8 KV CIRCUIT BREAKERS IN EOA STATIONS
Provide all required technical services to rearrange, reconfigure, retesting &re-commissioning of existing SCADA RTUS at  Sang 69/13.8KV, Anood 69/13.8KV, KFU 69/13.8KV, Borshaid 69/13.8KV, Nasira 69/13.8KV, and Meridien 69/13.8KV substations.

NOVEMBER, 2015 Alstom SAUDI ELECTRICITY CO.

EXPANSION OF MEDINA SOUTH 380/110KV S/S
Render  re-Configuration and Re-Commissioning Services for the existing SCADA RTU at Medina South substation.

AUGUST, 2015 Al-Gihaz SAUDI ELECTRICITY CO.

EXPANSION OF UN-3 110/13.8KV SUBSTATION, JEDDAH
Expand the existing XCell SCADA RTU at UN-3 substation by providing expansion kits, performing expansion engineering, HW installation, redeveloping configuration engineering and, testing & recommissioning. Render  re-Configuration and Re-Commissioning Services for the existing XCell SCADA RTU at Jamia S/S.

JUNE, 2015 CONCO SAUDI ELECTRICITY CO.

REPLACEMENT OF ABTS, ATS, AND RTCC
Expand the existing SCADA RTU at Bayounia, Ittisalat, Dammam Housing, Qatif Grid, Dammam Grid, Khobar Industrial, Doha, Borshaid, Ummal, Aziziyah, Faisaliyah substations by providing expansion kits, performing expansion engineering, HW installation, redeveloping  configuration engineering and, testing & recommissioning.

Completed Project

JULY, 2017 NCC SAUDI ELECTRICITY CO.

POWER SYSTEM RELIABILITY IMPROVEMENT PROJECT FOR ARAMCO SOUTHERN AREA OIL OPERATION(SAOO)
Expand the existing XCell SCADA RTU at Uthmaniyah P/P 115/13.8kV S/S by providing expansion kits, performing expansion engineering, HW installation, redeveloping configuration engineering and, testing & recommissioning.

FEBRUARY, 2017 Treg Al Jaafari SAUDI ELECTRICITY CO.

REINFORCEMENT OF AL FURSAN 115/13.8KV S/S
Expand the existing XCell SCADA RTU at Al Fursan substation by providing expansion kits, performing expansion engineering, HW installation, redeveloping  configuration engineering and, testing & recommissioning.

NOVEMBER, 2015 Alfanar SAUDI ELECTRICITY CO.

REINFORCEMENT OF AL-RAWABI 132/13.8KV S/S IN ARAR AREA
Expand the existing SCADA RTU at Al-Rawabi substation by providing expansion kits, performing expansion engineering, HW installation, redeveloping  configuration engineering and, testing & recommissioning.

NOVEMBER, 2015 Alfanar SAUDI ELECTRICITY CO.

EXPANSION OF ABQAIQ CENTRAL 230KV S/S
Expand the existing SCADA RTU at Abqaiq Central substation by providing expansion kits, performing expansion engineering, HW installation, redeveloping  configuration engineering and, testing & recommissioning.

OCTOBER, 2015 Alstom SAUDI ELECTRICITY CO.

REINFORCEMENT OF #7600 S/S IN DAWADAMI
Expand the existing SCADA RTU at Dawadami 33/13.8kV substation No. 7600 by providing expansion kits, performing expansion engineering, HW installation, redeveloping configuration engineering and, testing & recommissioning.

APRIL, 2015 Alfanar SAUDI ELECTRICITY CO.

REPLACEMENT OF 13.8KV SWITCHGEAR IN 17BD AND 19BD
Expand the existing SCADA RTU at 17BD substation and 19BD substation by providing expansion kits, performing expansion engineering, HW installation, redeveloping  configuration engineering and, testing & recommissioning.

FEBRUARY, 2015 SIEMENS SAUDI ELECTRICITY CO.

SCADA AND SOE EXPANSION AT THE REMOTE ENDS OF FARAS AND AL-KHARJ
Expand the existing SCADA RTU at Faras 380KVsubstation and substation No. 9003 by providing expansion kits, performing expansion engineering, HW installation, redeveloping  configuration engineering and, testing & recommissioning.

DECEMBER, 2014 TIEPCO SAUDI ELECTRICITY CO.

INSTALLATION OF VOLTAGE REGULATOR AND PARALLEL OPERATION AT TABARJAL POWER PLANT-33/13.8KV SUBSTATIONS
Expand the existing SCADA RTU atTabarjal 33/13.8kVsubstation by providing expansion kits, performing expansion engineering, HW installation, redeveloping  configuration engineering and, testing & recommissioning.

NOVEMBER, 2014 Al-Osais Contracting Company SAUDI ELECTRICITY CO.

DIVERSION OF 44BC S/S FROM BERRI P/P TO JUBAIL-2 230/115/34.5KV SUB-1
Expand the existing SCADA RTU and SOER at 44BC substation and  Jubail-2 substation No.1 by providing expansion kits, performing expansion engineering, HW installation, redeveloping  configuration engineering and, testing & recommissioning.

OCTOBER, 2014 ABB Automation SAUDI ELECTRICITY CO.

CONSTRUCTION OF AL-HASSA SOUTHWEST 380/230/115/13.8 KV BSP
Expand the existing SCADA RTU at Faras 380kV, Faras 230kV, Hawiyah 380kV BSP, Mahasen 230kV, RWPS-5 230kV, Wasia 230kV, and Uthmaniyah 115kV substations by providing expansion kits, performing expansion engineering, HW installation, redeveloping  configuration engineering and, testing & recommissioning.

OCTOBER, 2014 ABB Automation SAUDI ELECTRICITY CO.

EXPANSION OF SCADA RTU AT JUBAIL-2 SUB-1 230KV SS
Expand the existing SCADA RTU and SOER at Jubail-2 230kV substation No.1by providing expansion kits, performing expansion engineering, HW installation, redeveloping  configuration engineering and, testing & recommissioning.

JULY, 2014 Tareg Al-Jaafari Contracting Co. SAUDI ELECTRICITY CO.

CONSTRUCTION OF JABAL AL-QARAH 115/13.8KV SUBSTATION
Expand the existing SCADA RTU at Abu Al-Hassah 115/13.8kVsubstation by providing expansion kits, performing expansion engineering, HW installation, redeveloping  configuration engineering and, testing & recommissioning.

CONSTRUCTION OF AL-MOHERIES 115/13.8KV SUBSTATION
Expand the existing SCADA RTU at Jawatha BSP and North Mubarraz substation by providing expansion kits, performing expansion engineering, HW installation, redeveloping configuration engineering and, testing & recommissioning.

REINFORCEMENT OF AL-MASOUDI 115/13.8KV SUBSTATION
Supplying a new panel to expand the existing RTU at Al-Masoudi to accommodate the additional SCADA signals.  The above activity involves engineering design, panel assembling, factory testing, site delivery, installation, reconfiguration engineering andtesting and commissioning.

REINFORCEMENT OF AL-QADISIYYAH 115/13.8KV SUBSTATION
Expand the existing SCADA RTU at Al-Qadisiyyah 115/13.8kVsubstation by providing expansion kits, performing expansion engineering, HW installation, redeveloping  configuration engineering and, testing & recommissioning.

NOVEMBER, 2013 Tareg Al-Jaafari Contracting Co. SAUDI ELECTRICITY CO.

69KV INTERTIES AMONG BSP IN DAMMAM AREA PHASE-III
Expand the existing SCADA RTU and SOERat Sahelia 69kV, Khobar Industrial 69kV, New East Khobar 69kV, Green Belt 69kV, Thuqbah BSP, Rakkah BSP, Dammam BSP, Qatif BSP substations by providing expansion kits, performing expansion engineering, HW installation, redeveloping  configuration engineering and, testing & recommissioning.

FEBRUARY, 2013 ABB contracting SAUDI ELECTRICITY CO.

REINFORCEMENT OF FARAS 230 KV P/P SUBSTATION
Expand the existing Harris Microplex SCADA RTU at Faras P/P 230kV substation by providing expansion kits, performing expansion engineering, HW installation, redeveloping  configuration engineering and, testing & recommissioning.

JANUARY, 2013 AREVA SAUDI ELECTRICITY CO.

WESTERN REGIONALCONTROL SYSTEM REPLACEMENT
Upgrade the existing XCell RTU for Thirty(30)substations in Western area (Saudi Arabia) to be able to connect IEC-104, the stations should be able to communicate during 4 ports to WRCC(Western Region Control Center)  All SCADA RTU related jobs are included such as engineering work related to the SCADA RTU installation, configuration / operational setup and testing & commissioning activities.

SEPTEMBER, 2012 Sojitz Corporation SAUDI ELECTRICITY CO.

CONSTRUCTION OF NEW QATIF 380/115/13.8KV BSP
Supply of New DSM at Jubail 380/230kV substation includes Design, Panel Assembling, factory testing, installation, HW operational setup, developing configuration engineering and, testing &commissioning. Expand the existing SCADA RTU and SOER Qatif 380kV BSP and Dhahiyah 380kV BSP by providing expansion kits, performing expansion engineering, HW installation, configuration engineering and, testing & recommissioning.

AUGUST, 2012 Tareg Al-Jaafari Contracting Co. SAUDI ELECTRICITY CO.

69KV INTERTIES AMONG BSP’S IN DAMMAM AREA PHASE-II – SEC-EOA
Expand the existing SCADA RTU at Dammam P/P substation, Ibn Khaldoun BSP, Tubashi, and Ittisalat substations by providing expansion kits, performing expansion engineering, HW installation, redeveloping  configuration engineering and, testing & recommissioning.

AUGUST, 2012 ABB SAUDI ELECTRICITY CO.

CONSTRUCTION OF 4 NEW 115/13.8 KV S/S AND REINFORCEMENT OF 2 S/S EOA
Expand the existing SCADA RTU at Hafar Al-Batin and Qaisumah P/P 115/13.8kV substations by providing expansion kits, performing expansion engineering, HW installation, redeveloping configuration engineering and, testing & recommissioning.

AUGUST, 2012 HAIF Company SAUDI ELECTRICITY CO.

REINFORCEMENT OF TABARJAL 33/13.8KV S/S
Expand the existing SCADA RTU at Tabarjal 33/13.8kV substation by providing expansion kits, performing expansion engineering, HW installation, redeveloping  configuration engineering and, testing & recommissioning.

JULY, 2012 Siemens SAUDI ELECTRICITY CO.

POWER FACTOR CORRECTION (PFC) FOR 115 KV SS IN EOA PHASE-I
Expand the existing SCADA RTU at New Rahima, Al Masoudi, Al Jalawiyah, HIE, Al Thebeyyah 115/13.8kVsubstations by providing expansion kits, performing expansion engineering, HW installation, redeveloping  configuration engineering and, testing & recommissioning.

MARCH, 2012 SSEM SAUDI ELECTRICITY CO.

POWER SUPPLY TO SIPCHEM PETROCHEMICAL CONVERSION IN JUBAIL-2 S/S 115KV UG CABLES AND PROTECTION
Supply of New SCADA RTU at PCC 115kV Substation, includes design, panel assembling, factory test, installation, HW operational setup, developing configuration engineering and, testing &commissioning. Expand the existing SCADA RTU and SOER at remote end  Jubail-2 230/115kV substation by providing expansion kits, performing expansion engineering, HW installation, redeveloping  configuration engineering and, testing & recommissioning.

MARCH, 2012 HAIF Company SAUDI ELECTRICITY CO.

REINFORCEMENT OF SADEA 33/13.8 KV S/S
Expand  the existing  SCADA RTU and  SOER at Sadea 33/13.8kV  substation by providing expansion kits, performing expansion engineering, HW installation, redeveloping  configuration engineering and, testing & recommissioning

JANUARY, 2012 Saudi Electricity Co. SAUDI ELECTRICITY CO.

REPLACEMENT OF (RTUS) AT TWENTY (20) SELECTED COMPANY GRID/SUBSTATION IN SEC-EOA/NOA PROJECT
Supply of SCADA RTU Replacementat 30CC-JRCC, 31CC-JRCC, 32CC-JRCC, Airfield, Awamia, Badrani, Bayonia, Borshaid, DIE-1A, DIE-1B, East Airport, Jamieyeen(Dammam Grid), Khudaria(West Dammam), King Fahad Airport, MODA, Hospital,  MODA Housing, Sport City, Qatif Grid, Tarut, Um Ashahk, substations, includes design, panel assembling, factory test, RTU replacement engineering works, HW operational setup, developing  configuration engineering and, testing & recommissioning.

DECEMBER, 2012 Abaja Contracting Company SAUDI ARAMCO

INTEGRATION AND UPGRADING’ SOLUTION FOR LEAK DETECTION SYSTEM
Provision of a Solution to Integrate and Upgrade the LDS at RMC Bldg 3301and perform on a lump sum Design, installation, configuration / operational setup and testing & commissioning activities.

December, 2011 Saudi Electricity Co. SAUDI ELECTRICITY CO.

MONITORING &CONTROL SUPPORTING HARDWARE DEVICES -MDNOD
Supply and install control hardware along with interface devices to Siemens Telegyr with full functions and configuration applications designed to view and monitor the control system interface between hardware and Siemens Telegyr at SEC-EOA Dammam HQ Main and in JRCC Control Center.

DECEMBER, 2011 PA-COST International SAUDI ELECTRICITY CO.

REINFORCEMENT OF THE ZALLUM VILLAGE 33/13.8 KV S/S
Supply of SCADA RTU and SOER Replacement for the existing Harris Microplex 5000 SCADA RTU and Ronan X500E SOER at Zallum Village 33/13.8kV substation, includes design, panel assembling, factory test, site replacement engineering works, HW operational setup, developing  configuration engineering and, testing & recommissioning.

SEPTEMBER, 2011 Siemens SAUDI ELECTRICITY CO.

CONSTRUCTION OF SAFANIYAH 380/230KV BSP
Supply of New SOER at Safaniyah substation No.10 and Saudi Aramco Substation, includes design, panel assembling, factory test, installation, HW operational setup, developing configuration engineering and, testing &commissioning. Expand the existing SCADA RTU and SOER at Eight(8) remote end  substations by providing expansion kits, performing expansion engineering, HW installation, redeveloping  configuration engineering and, testing & recommissioning.

SEPTEMBER, 2011 Siemens SAUDI ELECTRICITY CO.

REPLACEMENT OF PROTECTION & CONTROL EQUIPMENT FOR 230 KV SUBSTATION IN DAMMAM AREA.
Expand  the existing  SCADA RTU and  SOER at Qatif BSP and Dammam BSP by providing expansion kits, performing expansion engineering, HW installation, redeveloping  configuration engineering and, testing & recommissioning

AUGUST, 2011 Siemens SAUDI ELECTRICITY CO.

POWER FACTOR CORRECTION (PFC) IN EOA PHASE-II
Expand  the existing  SCADA RTUs at  Khobar Industrial, Qatif Grid, Tarut, Meridian, Al-Manakh, Al-Mutlaq, Doha, KFUPM-1, Awamiyah, KFUPM-II, Safwa, Air Field, Sang, Al-Salam, Ain-Nakheel, Saudi Cement substations by providing expansion kits, performing expansion engineering, HW installation, redeveloping  configuration engineering and, testing & recommissioning

MARCH, 2011 Siemens SAUDI INTERNATIONAL PETROCHEMICAL COMPANY

IUCL 115KV POWER SUPPLY AND SUBSTATION
Supply of New SCADA RTU at IUCL 115kV substation, includes design, panel assembling, factory test, installation, HW operational setup, developingconfiguration engineering and, testing & commissioning. Expand the existing SCADA RTU and SOER at  remote end Jubail South East 230kV substation by providing expansion kits, performing expansion engineering, HW installation, redeveloping  configuration engineering and, testing & recommissioning.

MARCH, 2011 Al-Mashariq Trading & Contracting Co. SAUDI ELECTRICITY CO.

SCADA RTUS TO FIFTEEN (15) 115KV SUBSTATION IN SEC-EOA
Supply of New SCADA RTU at As-Sarrar, As-Sayyit, Chicken Ranch, Hanidh, Haradh, Khur Thiabah, Nata, Rafeah, RWPS 3C, RWPS 4C, Sadawi, Shamlol, Tufiah, Umm Al Arad, Uthmaniyah-6, includes design, panel assembling,, factory test, installation,  HW operational setup, developing  configuration engineering and, testing & commissioning.

MARCH, 2011 Al-Osais Contracting Company SAUDI ELECTRICITY CO.

CONSTRUCTION OF NEW AZ-ZUHOOR 69/13.8 KV SUBSTATION
Supply of New SCADA RTU at New Az-Zuhoor 69/13.8kV substation, includes design, panel assembling, factory test, installation, HW operational setup, developing configuration engineering and, testing & commissioning.

NOVEMBER, 2010 Energy & Power Contracting Co. Ltd SAUDI ELECTRICITY CO.

EXPANSION OF SCADA AND SOE RTU AT BERRI POWER PLANT
Expand the existing L&G SCADA RTU and Ronan SOER at  Berri P/P substation by providing expansion kits, performing expansion engineering, HW installation, redeveloping  configuration engineering and, testing & recommissioning.

OCTOBER, 2009 Siemens SAUDI ELECTRICITY CO.

INSTALLATION OF 132KV QASSIM CAPACITOR BANK - SS#8800
Expand the existing SCADA RTU at  Qassim 132kV substation No. 8800by providing expansion kits, performing expansion engineering, HW installation, redeveloping  configuration engineering and, testing & recommissioning.

APRIL, 2009 Al-Osais Contracting Company SAUDI ELECTRICITY CO.

CONSTRUCTION OF NEW AL-DHAHIYAH BSP
Supply New DSM at New Dhahiyah BSP, includes design, panel assembling,, factory test, installation,  HW operational setup, developing  configuration engineering and, testing & commissioning.

DECEMBER, 2008 Al-Babtain Contracting Company SAUDI ELECTRICITY CO.

REINFORCEMENT OF NO. 8077 132KV SUBSTATION, SEC-COA
Expand the existing SCADA RTU at  132kV substation No.8077by providing expansion kits, performing expansion engineering, HW installation, redeveloping configuration engineering and, testing & recommissioning.

AUGUST, 2008 SSEM SAUDI ELECTRICITY CO.

CONSTRUCTION OF NEW 380/132KV SUBSTATION NO.9023 IN P/P-10 RIYADH
Supply of New DSMat P/P-10 substation No. 9023and New SOER at remote ends 9002, 9003, 9013, 9015, 9021, 8069, 8020, 8706substations, includes design, panel assembling,, factory test, installation,  HW operational setup, developing  configuration engineering and, testing & commissioning.

AUGUST, 2008 Al-Fanar SAUDI ELECTRICITY CO.

ADDITIONAL POWER SUPPLY TO KING FAISAL UNIVERSITY 115/13.8KV S/S
Supply New SCADA RTU at New King Faisal University 115/13.8kV substation, includes design, panel assembling, factory test, installation, HW operational setup, developing configuration engineering and, testing & commissioning. Expand the existing SCADA RTU at remote ends  Al-Hassah 115/13.8kV and South Hofuf 115/13.8kV substations by providing expansion kits, performing expansion engineering, HW installation, redeveloping  configuration engineering and, testing & recommissioning.

JULY, 2008 SSEM SAUDI ELECTRICITY CO.

CONSTRUCTION OF NEW 132/13.8KV SUBSTATION NO.8165 DURRAT AL-RIYADH
Supply New DSM at New Durrat Al-Riyadh substation No.8165, includes design, panel assembling,, factory test, installation,  HW operational setup, developing  configuration engineering and, testing & commissioning.

JUNE, 2008 SSEM SAUDI ELECTRICITY CO.

ROYAL COMMISSION PROJECT EPC OF 2 SUBSTATIONS FOR JUBAIL 2 STAGE 2
Supply New DSM at New Jubail-2 substation No.2, includes design, panel assembling,, factory test, installation,  HW operational setup, developing  configuration engineering and, testing & commissioning.

JUNE, 2008 Al Toukhi Co. SAUDI ELECTRICITY CO.

REINFORCEMENT OF DOUMAT AL-JANDAL 132/33/13.8KV SUBSTATION
Expand the existing SCADA RTU at Doumat Al-Jandal 132/33/13.8kV substation by providing expansion kits, performing expansion engineering, HW installation, redeveloping  configuration engineering and, testing & recommissioning.

MAY, 2008 Al-Fanar SAUDI ELECTRICITY CO.

REINFORCEMENT OF WADI JALEEL 380KV SUBSTATION
Expand the existing SCADA RTU at Wadi Jaleel 380kV substation by providing expansion kits, performing expansion engineering, HW installation, redeveloping  configuration engineering and, testing & recommissioning.

MAY, 2008 AREVA SAUDI ELECTRICITY CO.

CONSTRUCTION OF NEW JUBAIL 380/230KV SUBSTATION IN JUBAIL 2
Supply of New DSM at New Jubail 380/230kV substation, and New SOER at Marafiq 380kV, PMD(Saudi Kayan) 230kV, and New Jubail 380kV substations, includes design, panel assembling,, factory test, installation,  HW operational setup, developing  configuration engineering and, testing & commissioning. Expand the existing SCADA RTU and SOER at remote ends Jubail North 230k, Berri 230kV, Jubail Community 230kV, Jubail South East 230kV, Jubail South West 230kV, NIGC 230kV, Jubail Khursaniyah 230kV, Al Fadhili 380/230kV, and Jubail 230kV substations by providing expansion kits, performing expansion engineering, HW installation, redeveloping  configuration engineering and, testing & recommissioning.

NOVEMBER, 2007 Al-Fanar SAUDI ELECTRICITY CO.

CONSTRUCTION OF 115KV OHTL FOR JUBAIL SECONDARY INDUSTRIES SUBSTATION AND NEW SAIHAT SUBSTATION
Supply of SCADA RTU Replacement for the existing SCI SCADA RTU at 44BC Substation and existing Ronan X500E SOER at Berri 230kV substation, includes design, panel assembling,, factory test, Replacement engineering n works,  HW operational setup, developing  configuration engineering and, testing & commissioning.

MARCH, 2007 Al-Fanar SAUDI ELECTRICITY CO.

CONSTRUCTION OF (HIE) 115/13.8KV SUBSTATION NO. 2 AND MODIFICATION OF 13.8KV SWITCHGEAR @ RWPS-3C, VALVE # 6.
Supply New SCADA RTU at New HIE 115/13.8kV substation No.2, includes design, panel assembling, factory test, installation, HW operational setup, developing configuration engineering and, testing & commissioning. Expand the existing SCADA RTU at remote end HIE 114/13.8kV substation and Al-Uyun substation by providing expansion kits, performing expansion engineering, HW installation, redeveloping  configuration engineering and, testing & recommissioning.

MARCH, 2007 National Contracting Co. SAUDI ELECTRICITY CO.

POWER SUPPLY TO SAUDI ARAMCO EAST/WEST PUMP STATION NO. 3
Supply New SCADA RTU and New SOER at New Saudi Aramco East/West Pump Station No.3, includes design, panel assembling, factory test, installation, HW operational setup, developing configuration engineering and, testing & commissioning.

Expand the existing SCADA RTU and SOER at remote end Wasia 230kV substation by providing expansion kits, performing expansion engineering, HW installation, redeveloping  configuration engineering and, testing & recommissioning.

OCTOBER, 2006 National Contracting Co. SAUDI ELECTRICITY CO.

CONSTRUCTION OF NEW JUBAIL - 2 230/110/34.5KV SUBSTATION -1
Supply New SCADA RTU and New SOER at New Jubail -2 230/110/34.5kV susbstation No. 1, includes design, panel assembling, factory test, installation, HW operational setup, developing configuration engineering and, testing & commissioning. Expand the existing SCADA RTU and SOER at remote ends  Jubail North 230kVand Al-Fadhili 380kV substations by providing expansion kits, performing expansion engineering, HW installation, redeveloping  configuration engineering and, testing & recommissioning.

OCTOBER, 2006 ABB SAUDI ELECTRICITY CO.

SCADA RETROFIT AT MADINAH SOUTH 380KV AND JAMIA 380KV SUBSTATIONS
Supply of SCADA RTU Replacement at Medinah South 380kV and Jamia 380kV Substations, includes design, panel assembling,, factory test, replacement engineering works,  HW operational setup, developing  configuration engineering and, testing & commissioning.

OCTOBER, 2006 ABB SAUDI ELECTRICITY CO.

DYNAMIC REACTIVE COMPENSATION IN WESTERN REGION
Supply New SCADA RTU, New SOER, New DSM, New TFR, and VQR at New SVC Faisaliyah 380kV, SVC Jamia 380kV, and SVC 380kV, includes design, panel assembling,, factory test, installation,  HW operational setup, developing  configuration engineering and, testing & commissioning.

AUGUST, 2006 Mohammed Al-Ojaimi Contracting Est. SAUDI ELECTRICITY CO.

ROYAL COMMISSION CONTRACT NO. 715/C05 HAII JALMUDAH 115/13.8KV S/S- 16BD
Supply of New SCADA RTU and New SOER at New 16BD (Jalmudah) 115/13.8kV susbstation, includes design, panel assembling, factory test, installation, HW operational setup, developing configuration engineering and, testing & commissioning. Expand the existing SCADA RTU and SOER at remote ends Haii Al-Jalmudah 115/13.8kV substation, Haii Al-Fanateer 114/13.8kV substation by providing expansion kits, performing expansion engineering, HW installation, redeveloping  configuration engineering and, testing & recommissioning.

AUGUST, 2006 Mohammed Al-Ojaimi Contracting Est. SAUDI ELECTRICITY CO.

CONSTRUCTION OF NEW RAHIMA 115/13.8KV SUBSTATION
Supply of New SCADA RTU at Rahima 115/13.8kV substation, includes design, panel assembling, factory test, installation, HW operational setup, developing configuration engineering and, testing & commissioning. Expand the existing SCADA RTU and SOER at remote end substation by providing expansion kits, performing expansion engineering, HW installation, redeveloping  configuration engineering and, testing & recommissioning.

SEPTEMBER, 2005 Al-Osais Contracting Company / SAUDI ELECTRICITY CO.

REINFORCEMENT OF DOUMAT AL-JANDAL 132/33/13.8KV SUBSTATION
Expand the existing SOER at Doumat Al-Jandal 132/33/13.8kV substation by providing expansion kits, performing expansion engineering, HW installation, redeveloping  configuration engineering and, testing & recommissioning

JULY, 2005 Larsen & Tubro SEC /SAUDI ARAMCO

CONSTRUCTION OF NEW JU’AYMAH 230KV BSP - JU’AYMAH AREA
Supply of New SCADA RTU at New Juaymah 230kV BSP,includes design, panel assembling, factory test, installation, HW operational setup, developing configuration engineering and, testing & commissioning. Expand the existing SCADA RTU and SOER at remote end substation by providing expansion kits, performing expansion engineering, HW installation, redeveloping  configuration engineering and, testing & recommissioning.

AUGUST, 2004 SSEM SAUDI ELECTRICITY CO.

CONSTRUCTION OF NEW JUBAIL SUBSTATION NO. 5, JUBAIL CITY.
Supply of New SCADA RTU at New Jubail substation No.5, includes design, panel assembling, factory test, installation, HW operational setup, developing configuration engineering and, testing & commissioning. Expand the existing SCADA RTU and SOER at remote end Berri 230kV substation by providing expansion kits, performing expansion engineering, HW installation, redeveloping  configuration engineering and, testing & recommissioning.

AUGUST, /2004 Al Toukhi Co. SAUDI ELECTRICITY CO.

CONSTRUCTION OF NEW AL-MANAKH 69/13.8 KV SUBSTATION AT QATIF AREA.
Supply of New SCADA RTU at Al-Manakh 69/13.8kV Substation, includes design, panel assembling, factory test, installation, HW operational setup, developing configuration engineering and, testing & commissioning. Expand the existing SCADA RTUat remote end Qatif BSP substationby providing expansion kits, performing expansion engineering, HW installation, redeveloping  configuration engineering and, testing & recommissioning.

JULY, 2004 SSEM SAUDI ELECTRICITY CO.

REINFORCEMENT OF TÁLIMI GRID SUBSTATION, AL-KHOBAR.
Supply of SCADA RTU Replacement at Shedgum 380kV Substation,includes design, panel assembling,, factory test, replacement engineering works,  HW operational setup, developing  configuration engineering and, testing & commissioning.

APRIL, 2003 ABB SAUDI ELECTRICITY CO.

CONSTRUCTION OF NEW SPIC 230 KV SUBSTATION - JUBAIL IND. CITY.
Expand the existing SOER at Jubail South East 230kV substation by providing expansion kits, performing expansion engineering, HW installation, redeveloping  configuration engineering and, testing & recommissioning.

JUNE, 2002 ABB SAUDI ELECTRICITY CO.

REINFORCEMENT OF FARAS 380 KV SUBSTATION
Supply of SCADA RTU Replacement at Faras 380kV Substation, includes design, panel assembling,, factory test, replacement engineering works,  HW operational setup, developing  configuration engineering and, testing & commissioning.

MAY, 2002 ABB SAUDI ELECTRICITY CO.

REINFORCEMENT OF SHEDGUM 380 KV SUBSTATION
Supply of SCADA RTU Replacement at Shedgum 380kV Substation, includes design, panel assembling,, factory test, replacement engineering works,  HW operational setup, developing  configuration engineering and, testing & commissioning.

MAY, 2002 Al-Mashariq Trading & Contracting Co. SAUDI ELECTRICITY CO.

CONSTRUCTION OF NEW MAZRO’AYA SUBSTATION AT DAMMAM AREA.
Supply of New SCADA RTU at Mazro’aya substation, includes design, panel assembling, factory test, installation, HW operational setup, developing configuration engineering and, testing & commissioning.

Supply of SCADA RTU Replacement for the existing Harris Microplex 5000 SCADA RTU at Anood Substation, includes design, panel assembling,, factory test, replacement engineering works,  HW operational setup, developing  configuration engineering and, testing & commissioning.

APRIL, 2002 ABB SAMSUNG

ERECTION OF NEW SPC 230 KV SUBSTATION AT JUBAIL INDUSTRIAL CITY
Supplyof New SOER at New SPC 230kV Substation, includes design, panel assembling, factory test, installation, HW operational setup, developing configuration engineering and, testing & commissioning. Expand the existing SCADA RTU and SOER at Jubail North 230kV substation by providing expansion kits, performing expansion engineering, HW installation, redeveloping  configuration engineering and, testing & recommissioning.

FEBRUARY, 2002 ABB SAUDI ELECTRICITY CO.

ERECTION OF NEW JUPC 230 KV SUBSTATION AT JUBAIL INDUSTRIAL CITY
Supplyof New SCADA RTU and SOER system at JUPC 230kV Substation, includes design, panel assembling, factory test, installation, HW operational setup, developing configuration engineering and, testing & commissioning. Expand the existing SCADA RTU and SOER at remote end Jubail North 230kVand Berri 230kV substations by providing expansion kits, performing expansion engineering, HW installation, redeveloping  configuration engineering and, testing & recommissioning.

JANUARY, 2002 Al Toukhi Co. SAUDI ELECTRICITY CO.

CONSTRUCTION OF NEW HAFAR AL-BATIN SUBSTATION NO. 5 AND REINFORCEMENT OF HAFAR AL-BATIN AREA.
Supply of New SCADA RTU at New Hafar Al-Batin Substation No.5, includes design, panel assembling, factory test, installation, HW operational setup, developing configuration engineering and, testing & commissioning.

Supply of SCADA RTU Replacement at Hafar Al-Batin Substation No.3 and Hafar Al-Batin Substation No.1, includes design, panel assembling, factory test, replacement engineering works, HW operational setup, developing configuration engineering and, testing & commissioning. Expand the existing SCADA RTU at Qaisumah P/P substation by providing expansion kits, performing expansion engineering, HW installation, redeveloping  configuration engineering and, testing & recommissioning.

DECEMBER, 2001 Nesma Co. Ltd. SAUDI ELECTRICITY CO.

EXTENSION OF NAVY BASE 115 KV SUBSATION AT JUBAIL
Expand the existing SCADA RTU and SOER at Jubail Navy Baseand Berri 230kV Substations by providing expansion kits, performing expansion engineering, HW installation, redeveloping  configuration engineering and, testing & recommissioning.

JULY, 2001 Mitsubishi SAUDI ELECTRICITY CO.

INSTALLATION OF DYNAMIC SYSTEMS MONITOR AT IBN KHLODOUN BSP, SHEDGUM 380 KV AND GHAZLLAN 230 KV
Supplyof New SRAFE Dynamic System Monitoring at Ibn Khaldoun BSP,  Shedgum 380kV, and Ghazlan 230kV Substations, includes design, panel assembling, factory test, installation, HW operational setup, developing configuration engineering and, testing & commissioning.

FEBRUARY, 2001 Saudi Electricity Co. SAUDI ELECTRICITY CO.

GENERATION OPTIMIZATION STUDY FOR ALL SEC BRANCHES
Provide local engineering labor as needed, administrative and coordination to PTI for their Generation Optimization Study contract with SEC-ERB for Kingdom wide study.

DECEMBER, 2000 Bin-Laden SAUDI ELECTRICITY CO.

CONSTRUCTION OF TUFAIH SUBSTATION AND REINFORCEMENT OF JUBAIL COMMERCIAL PORT SUBSTATION AND MODIFICATION OF QAISUMAH P/P
Supply of SCADA RTU Replacement at Jubail Commercial Port Substation, includes design, panel assembling, factory test, replacement engineering works, HW operational setup, developing configuration engineering and, testing & commissioning.

NOVEMBER, 2000 ABB SAUDI ELECTRICITY CO.

REINFORCEMENT QATIF BSP SUBSTATION, QATIF AREA
Expand the existing SCADA RTU at Qatif BSP by providing expansion kits, performing expansion engineering, HW installation, redeveloping  configuration engineering and, testing & recommissioning.

JANUARY, 2000 ABB SAUDI ELECTRICITY CO.

CONSTRUCTION OF NEW IBN-ZAHAR 230 KV SUBSTATION AT JUBAIL INDUSTRIAL CITY.
Supply of New Redundant SCADA RTU at Ibn Zahar 230kV Substation, includes design, panel assembling, factory test, installation, HW operational setup, developing configuration engineering and, testing & commissioning.

AUGUST, 1999 JAL International SAUDI ELECTRICITY CO.

SCADA RTUS INSTALLATION AT 8 DOA SUBSTATIONS
Rendering re-configuration Engineering and testing & Commissioning Services at Eight(8) substations in SEC’s Dammam Operating Area.

APRIL, 1999 Marubini SAUDI ELECTRICITY CO.

REINFORCEMENT OF GHUNAN 380 KV SUBSTATION
Expand the existing SOER at Ghunan 380kV substation  by providing expansion kits, performing expansion engineering, HW installation, redeveloping  configuration engineering and, testing & recommissioning.

FEBRUARY, 1998 JAL International SAUDI ELECTRICITY CO.

INSTALLATION OF NINE (9) METROLOGICAL STATIONS AT VARIOUS SEC-ERB’S GENERATION SITES
Our scope is limited to field and equipment interfacing engineering design, Supervision, testing and commissioning of 9 Meteorological Stations installed at 9 SCECO-East Power Plants.  These stations measure wind speed, wind direction, ambient Temperature, relative humidity, atmospheric pressure and dew point

JUNE, 1997 Al-Fanar SAUDI ELECTRICITY CO.

REINFORCEMENT OF SOUTH HOFOUF 230/115 KV S/S, HOFOUF
Expand the existing Harris Microplex 5000 SCADA RTU at South Hofouf 230/115kV substation  by providing expansion kits, performing expansion engineering, HW installation, redeveloping  configuration engineering and, testing & recommissioning.

JANUARY, 1997 ABB SAUDI ELECTRICITY CO.

SCADA & SOE SYSTEMS EXPANSION AT BORSHAID 69/13.8 KV S/S AND SHEDGUM S/S
Expand the existing SCADA RTU at Borshaid substation  by providing expansion kits, performing expansion engineering, HW installation, redeveloping  configuration engineering and, testing & recommissioning.

SEPTEMEBER, 1996 National Contracting Co. ROYAL COMMISSION

REINFORCEMENT OF 17BD SUBSTATION, JUBAIL INDUSTRIAL CITY
Expand the existing SCADA RTUs at all four(4) substations  by providing expansion kits, performing expansion engineering, HW installation, redeveloping  configuration engineering and, testing & recommissioning.