Render re-Configuration and Re-Commissioning Services for the existing SCADA RTU at Zallum Village 33/13.8kV substation.
Render re-Configuration and Re-Commissioning Services for the existing SCADA RTU at KM-5 substation.
Provide all required technical services to rearrange, reconfigure, retesting &re-commissioning of existing SCADA RTUS at Sang 69/13.8KV, Anood 69/13.8KV, KFU 69/13.8KV, Borshaid 69/13.8KV, Nasira 69/13.8KV, and Meridien 69/13.8KV substations.
Render re-Configuration and Re-Commissioning Services for the existing SCADA RTU at Medina South substation.
Expand the existing XCell SCADA RTU at UN-3 substation by providing expansion kits, performing expansion engineering, HW installation, redeveloping configuration engineering and, testing & recommissioning. Render re-Configuration and Re-Commissioning Services for the existing XCell SCADA RTU at Jamia S/S.
Expand the existing SCADA RTU at Bayounia, Ittisalat, Dammam Housing, Qatif Grid, Dammam Grid, Khobar Industrial, Doha, Borshaid, Ummal, Aziziyah, Faisaliyah substations by providing expansion kits, performing expansion engineering, HW installation, redeveloping configuration engineering and, testing & recommissioning.
Expand the existing XCell SCADA RTU at Uthmaniyah P/P 115/13.8kV S/S by providing expansion kits, performing expansion engineering, HW installation, redeveloping configuration engineering and, testing & recommissioning.
Expand the existing XCell SCADA RTU at Al Fursan substation by providing expansion kits, performing expansion engineering, HW installation, redeveloping configuration engineering and, testing & recommissioning.
Expand the existing SCADA RTU at Al-Rawabi substation by providing expansion kits, performing expansion engineering, HW installation, redeveloping configuration engineering and, testing & recommissioning.
Expand the existing SCADA RTU at Abqaiq Central substation by providing expansion kits, performing expansion engineering, HW installation, redeveloping configuration engineering and, testing & recommissioning.
Expand the existing SCADA RTU at Dawadami 33/13.8kV substation No. 7600 by providing expansion kits, performing expansion engineering, HW installation, redeveloping configuration engineering and, testing & recommissioning.
Expand the existing SCADA RTU at 17BD substation and 19BD substation by providing expansion kits, performing expansion engineering, HW installation, redeveloping configuration engineering and, testing & recommissioning.
Expand the existing SCADA RTU at Faras 380KVsubstation and substation No. 9003 by providing expansion kits, performing expansion engineering, HW installation, redeveloping configuration engineering and, testing & recommissioning.
Expand the existing SCADA RTU atTabarjal 33/13.8kVsubstation by providing expansion kits, performing expansion engineering, HW installation, redeveloping configuration engineering and, testing & recommissioning.
Expand the existing SCADA RTU and SOER at 44BC substation and Jubail-2 substation No.1 by providing expansion kits, performing expansion engineering, HW installation, redeveloping configuration engineering and, testing & recommissioning.
Expand the existing SCADA RTU at Faras 380kV, Faras 230kV, Hawiyah 380kV BSP, Mahasen 230kV, RWPS-5 230kV, Wasia 230kV, and Uthmaniyah 115kV substations by providing expansion kits, performing expansion engineering, HW installation, redeveloping configuration engineering and, testing & recommissioning.
Expand the existing SCADA RTU and SOER at Jubail-2 230kV substation No.1by providing expansion kits, performing expansion engineering, HW installation, redeveloping configuration engineering and, testing & recommissioning.
Expand the existing SCADA RTU at Abu Al-Hassah 115/13.8kVsubstation by providing expansion kits, performing expansion engineering, HW installation, redeveloping configuration engineering and, testing & recommissioning.
Expand the existing SCADA RTU at Jawatha BSP and North Mubarraz substation by providing expansion kits, performing expansion engineering, HW installation, redeveloping configuration engineering and, testing & recommissioning.
Supplying a new panel to expand the existing RTU at Al-Masoudi to accommodate the additional SCADA signals. The above activity involves engineering design, panel assembling, factory testing, site delivery, installation, reconfiguration engineering andtesting and commissioning.
Expand the existing SCADA RTU at Al-Qadisiyyah 115/13.8kVsubstation by providing expansion kits, performing expansion engineering, HW installation, redeveloping configuration engineering and, testing & recommissioning.
Expand the existing SCADA RTU and SOERat Sahelia 69kV, Khobar Industrial 69kV, New East Khobar 69kV, Green Belt 69kV, Thuqbah BSP, Rakkah BSP, Dammam BSP, Qatif BSP substations by providing expansion kits, performing expansion engineering, HW installation, redeveloping configuration engineering and, testing & recommissioning.
Expand the existing Harris Microplex SCADA RTU at Faras P/P 230kV substation by providing expansion kits, performing expansion engineering, HW installation, redeveloping configuration engineering and, testing & recommissioning.
Upgrade the existing XCell RTU for Thirty(30)substations in Western area (Saudi Arabia) to be able to connect IEC-104, the stations should be able to communicate during 4 ports to WRCC(Western Region Control Center) All SCADA RTU related jobs are included such as engineering work related to the SCADA RTU installation, configuration / operational setup and testing & commissioning activities.
Supply of New DSM at Jubail 380/230kV substation includes Design, Panel Assembling, factory testing, installation, HW operational setup, developing configuration engineering and, testing &commissioning. Expand the existing SCADA RTU and SOER Qatif 380kV BSP and Dhahiyah 380kV BSP by providing expansion kits, performing expansion engineering, HW installation, configuration engineering and, testing & recommissioning.
Expand the existing SCADA RTU at Dammam P/P substation, Ibn Khaldoun BSP, Tubashi, and Ittisalat substations by providing expansion kits, performing expansion engineering, HW installation, redeveloping configuration engineering and, testing & recommissioning.
Expand the existing SCADA RTU at Hafar Al-Batin and Qaisumah P/P 115/13.8kV substations by providing expansion kits, performing expansion engineering, HW installation, redeveloping configuration engineering and, testing & recommissioning.
Expand the existing SCADA RTU at Tabarjal 33/13.8kV substation by providing expansion kits, performing expansion engineering, HW installation, redeveloping configuration engineering and, testing & recommissioning.
Expand the existing SCADA RTU at New Rahima, Al Masoudi, Al Jalawiyah, HIE, Al Thebeyyah 115/13.8kVsubstations by providing expansion kits, performing expansion engineering, HW installation, redeveloping configuration engineering and, testing & recommissioning.
Supply of New SCADA RTU at PCC 115kV Substation, includes design, panel assembling, factory test, installation, HW operational setup, developing configuration engineering and, testing &commissioning. Expand the existing SCADA RTU and SOER at remote end Jubail-2 230/115kV substation by providing expansion kits, performing expansion engineering, HW installation, redeveloping configuration engineering and, testing & recommissioning.
Expand the existing SCADA RTU and SOER at Sadea 33/13.8kV substation by providing expansion kits, performing expansion engineering, HW installation, redeveloping configuration engineering and, testing & recommissioning
Supply of SCADA RTU Replacementat 30CC-JRCC, 31CC-JRCC, 32CC-JRCC, Airfield, Awamia, Badrani, Bayonia, Borshaid, DIE-1A, DIE-1B, East Airport, Jamieyeen(Dammam Grid), Khudaria(West Dammam), King Fahad Airport, MODA, Hospital, MODA Housing, Sport City, Qatif Grid, Tarut, Um Ashahk, substations, includes design, panel assembling, factory test, RTU replacement engineering works, HW operational setup, developing configuration engineering and, testing & recommissioning.
Provision of a Solution to Integrate and Upgrade the LDS at RMC Bldg 3301and perform on a lump sum Design, installation, configuration / operational setup and testing & commissioning activities.
Supply and install control hardware along with interface devices to Siemens Telegyr with full functions and configuration applications designed to view and monitor the control system interface between hardware and Siemens Telegyr at SEC-EOA Dammam HQ Main and in JRCC Control Center.
Supply of SCADA RTU and SOER Replacement for the existing Harris Microplex 5000 SCADA RTU and Ronan X500E SOER at Zallum Village 33/13.8kV substation, includes design, panel assembling, factory test, site replacement engineering works, HW operational setup, developing configuration engineering and, testing & recommissioning.
Supply of New SOER at Safaniyah substation No.10 and Saudi Aramco Substation, includes design, panel assembling, factory test, installation, HW operational setup, developing configuration engineering and, testing &commissioning. Expand the existing SCADA RTU and SOER at Eight(8) remote end substations by providing expansion kits, performing expansion engineering, HW installation, redeveloping configuration engineering and, testing & recommissioning.
Expand the existing SCADA RTU and SOER at Qatif BSP and Dammam BSP by providing expansion kits, performing expansion engineering, HW installation, redeveloping configuration engineering and, testing & recommissioning
Expand the existing SCADA RTUs at Khobar Industrial, Qatif Grid, Tarut, Meridian, Al-Manakh, Al-Mutlaq, Doha, KFUPM-1, Awamiyah, KFUPM-II, Safwa, Air Field, Sang, Al-Salam, Ain-Nakheel, Saudi Cement substations by providing expansion kits, performing expansion engineering, HW installation, redeveloping configuration engineering and, testing & recommissioning
Supply of New SCADA RTU at IUCL 115kV substation, includes design, panel assembling, factory test, installation, HW operational setup, developingconfiguration engineering and, testing & commissioning. Expand the existing SCADA RTU and SOER at remote end Jubail South East 230kV substation by providing expansion kits, performing expansion engineering, HW installation, redeveloping configuration engineering and, testing & recommissioning.
Supply of New SCADA RTU at As-Sarrar, As-Sayyit, Chicken Ranch, Hanidh, Haradh, Khur Thiabah, Nata, Rafeah, RWPS 3C, RWPS 4C, Sadawi, Shamlol, Tufiah, Umm Al Arad, Uthmaniyah-6, includes design, panel assembling,, factory test, installation, HW operational setup, developing configuration engineering and, testing & commissioning.
Supply of New SCADA RTU at New Az-Zuhoor 69/13.8kV substation, includes design, panel assembling, factory test, installation, HW operational setup, developing configuration engineering and, testing & commissioning.
Expand the existing L&G SCADA RTU and Ronan SOER at Berri P/P substation by providing expansion kits, performing expansion engineering, HW installation, redeveloping configuration engineering and, testing & recommissioning.
Expand the existing SCADA RTU at Qassim 132kV substation No. 8800by providing expansion kits, performing expansion engineering, HW installation, redeveloping configuration engineering and, testing & recommissioning.
Supply New DSM at New Dhahiyah BSP, includes design, panel assembling,, factory test, installation, HW operational setup, developing configuration engineering and, testing & commissioning.
Expand the existing SCADA RTU at 132kV substation No.8077by providing expansion kits, performing expansion engineering, HW installation, redeveloping configuration engineering and, testing & recommissioning.
Supply of New DSMat P/P-10 substation No. 9023and New SOER at remote ends 9002, 9003, 9013, 9015, 9021, 8069, 8020, 8706substations, includes design, panel assembling,, factory test, installation, HW operational setup, developing configuration engineering and, testing & commissioning.
Supply New SCADA RTU at New King Faisal University 115/13.8kV substation, includes design, panel assembling, factory test, installation, HW operational setup, developing configuration engineering and, testing & commissioning. Expand the existing SCADA RTU at remote ends Al-Hassah 115/13.8kV and South Hofuf 115/13.8kV substations by providing expansion kits, performing expansion engineering, HW installation, redeveloping configuration engineering and, testing & recommissioning.
Supply New DSM at New Durrat Al-Riyadh substation No.8165, includes design, panel assembling,, factory test, installation, HW operational setup, developing configuration engineering and, testing & commissioning.
Supply New DSM at New Jubail-2 substation No.2, includes design, panel assembling,, factory test, installation, HW operational setup, developing configuration engineering and, testing & commissioning.
Expand the existing SCADA RTU at Doumat Al-Jandal 132/33/13.8kV substation by providing expansion kits, performing expansion engineering, HW installation, redeveloping configuration engineering and, testing & recommissioning.
Expand the existing SCADA RTU at Wadi Jaleel 380kV substation by providing expansion kits, performing expansion engineering, HW installation, redeveloping configuration engineering and, testing & recommissioning.
Supply of New DSM at New Jubail 380/230kV substation, and New SOER at Marafiq 380kV, PMD(Saudi Kayan) 230kV, and New Jubail 380kV substations, includes design, panel assembling,, factory test, installation, HW operational setup, developing configuration engineering and, testing & commissioning. Expand the existing SCADA RTU and SOER at remote ends Jubail North 230k, Berri 230kV, Jubail Community 230kV, Jubail South East 230kV, Jubail South West 230kV, NIGC 230kV, Jubail Khursaniyah 230kV, Al Fadhili 380/230kV, and Jubail 230kV substations by providing expansion kits, performing expansion engineering, HW installation, redeveloping configuration engineering and, testing & recommissioning.
Supply of SCADA RTU Replacement for the existing SCI SCADA RTU at 44BC Substation and existing Ronan X500E SOER at Berri 230kV substation, includes design, panel assembling,, factory test, Replacement engineering n works, HW operational setup, developing configuration engineering and, testing & commissioning.
Supply New SCADA RTU at New HIE 115/13.8kV substation No.2, includes design, panel assembling, factory test, installation, HW operational setup, developing configuration engineering and, testing & commissioning. Expand the existing SCADA RTU at remote end HIE 114/13.8kV substation and Al-Uyun substation by providing expansion kits, performing expansion engineering, HW installation, redeveloping configuration engineering and, testing & recommissioning.
Supply New SCADA RTU and New SOER at New Saudi Aramco East/West Pump Station No.3, includes design, panel assembling, factory test, installation, HW operational setup, developing configuration engineering and, testing & commissioning.
Expand the existing SCADA RTU and SOER at remote end Wasia 230kV substation by providing expansion kits, performing expansion engineering, HW installation, redeveloping configuration engineering and, testing & recommissioning.
Supply New SCADA RTU and New SOER at New Jubail -2 230/110/34.5kV susbstation No. 1, includes design, panel assembling, factory test, installation, HW operational setup, developing configuration engineering and, testing & commissioning. Expand the existing SCADA RTU and SOER at remote ends Jubail North 230kVand Al-Fadhili 380kV substations by providing expansion kits, performing expansion engineering, HW installation, redeveloping configuration engineering and, testing & recommissioning.
Supply of SCADA RTU Replacement at Medinah South 380kV and Jamia 380kV Substations, includes design, panel assembling,, factory test, replacement engineering works, HW operational setup, developing configuration engineering and, testing & commissioning.
Supply New SCADA RTU, New SOER, New DSM, New TFR, and VQR at New SVC Faisaliyah 380kV, SVC Jamia 380kV, and SVC 380kV, includes design, panel assembling,, factory test, installation, HW operational setup, developing configuration engineering and, testing & commissioning.
Supply of New SCADA RTU and New SOER at New 16BD (Jalmudah) 115/13.8kV susbstation, includes design, panel assembling, factory test, installation, HW operational setup, developing configuration engineering and, testing & commissioning. Expand the existing SCADA RTU and SOER at remote ends Haii Al-Jalmudah 115/13.8kV substation, Haii Al-Fanateer 114/13.8kV substation by providing expansion kits, performing expansion engineering, HW installation, redeveloping configuration engineering and, testing & recommissioning.
Supply of New SCADA RTU at Rahima 115/13.8kV substation, includes design, panel assembling, factory test, installation, HW operational setup, developing configuration engineering and, testing & commissioning. Expand the existing SCADA RTU and SOER at remote end substation by providing expansion kits, performing expansion engineering, HW installation, redeveloping configuration engineering and, testing & recommissioning.
Expand the existing SOER at Doumat Al-Jandal 132/33/13.8kV substation by providing expansion kits, performing expansion engineering, HW installation, redeveloping configuration engineering and, testing & recommissioning
Supply of New SCADA RTU at New Juaymah 230kV BSP,includes design, panel assembling, factory test, installation, HW operational setup, developing configuration engineering and, testing & commissioning. Expand the existing SCADA RTU and SOER at remote end substation by providing expansion kits, performing expansion engineering, HW installation, redeveloping configuration engineering and, testing & recommissioning.
Supply of New SCADA RTU at New Jubail substation No.5, includes design, panel assembling, factory test, installation, HW operational setup, developing configuration engineering and, testing & commissioning. Expand the existing SCADA RTU and SOER at remote end Berri 230kV substation by providing expansion kits, performing expansion engineering, HW installation, redeveloping configuration engineering and, testing & recommissioning.
Supply of New SCADA RTU at Al-Manakh 69/13.8kV Substation, includes design, panel assembling, factory test, installation, HW operational setup, developing configuration engineering and, testing & commissioning. Expand the existing SCADA RTUat remote end Qatif BSP substationby providing expansion kits, performing expansion engineering, HW installation, redeveloping configuration engineering and, testing & recommissioning.
Supply of SCADA RTU Replacement at Shedgum 380kV Substation,includes design, panel assembling,, factory test, replacement engineering works, HW operational setup, developing configuration engineering and, testing & commissioning.
Expand the existing SOER at Jubail South East 230kV substation by providing expansion kits, performing expansion engineering, HW installation, redeveloping configuration engineering and, testing & recommissioning.
Supply of SCADA RTU Replacement at Faras 380kV Substation, includes design, panel assembling,, factory test, replacement engineering works, HW operational setup, developing configuration engineering and, testing & commissioning.
Supply of SCADA RTU Replacement at Shedgum 380kV Substation, includes design, panel assembling,, factory test, replacement engineering works, HW operational setup, developing configuration engineering and, testing & commissioning.
Supply of New SCADA RTU at Mazro’aya substation, includes design, panel assembling, factory test, installation, HW operational setup, developing configuration engineering and, testing & commissioning.
Supply of SCADA RTU Replacement for the existing Harris Microplex 5000 SCADA RTU at Anood Substation, includes design, panel assembling,, factory test, replacement engineering works, HW operational setup, developing configuration engineering and, testing & commissioning.
Supplyof New SOER at New SPC 230kV Substation, includes design, panel assembling, factory test, installation, HW operational setup, developing configuration engineering and, testing & commissioning. Expand the existing SCADA RTU and SOER at Jubail North 230kV substation by providing expansion kits, performing expansion engineering, HW installation, redeveloping configuration engineering and, testing & recommissioning.
Supplyof New SCADA RTU and SOER system at JUPC 230kV Substation, includes design, panel assembling, factory test, installation, HW operational setup, developing configuration engineering and, testing & commissioning. Expand the existing SCADA RTU and SOER at remote end Jubail North 230kVand Berri 230kV substations by providing expansion kits, performing expansion engineering, HW installation, redeveloping configuration engineering and, testing & recommissioning.
Supply of New SCADA RTU at New Hafar Al-Batin Substation No.5, includes design, panel assembling, factory test, installation, HW operational setup, developing configuration engineering and, testing & commissioning.
Supply of SCADA RTU Replacement at Hafar Al-Batin Substation No.3 and Hafar Al-Batin Substation No.1, includes design, panel assembling, factory test, replacement engineering works, HW operational setup, developing configuration engineering and, testing & commissioning. Expand the existing SCADA RTU at Qaisumah P/P substation by providing expansion kits, performing expansion engineering, HW installation, redeveloping configuration engineering and, testing & recommissioning.
Expand the existing SCADA RTU and SOER at Jubail Navy Baseand Berri 230kV Substations by providing expansion kits, performing expansion engineering, HW installation, redeveloping configuration engineering and, testing & recommissioning.
Supplyof New SRAFE Dynamic System Monitoring at Ibn Khaldoun BSP, Shedgum 380kV, and Ghazlan 230kV Substations, includes design, panel assembling, factory test, installation, HW operational setup, developing configuration engineering and, testing & commissioning.
Provide local engineering labor as needed, administrative and coordination to PTI for their Generation Optimization Study contract with SEC-ERB for Kingdom wide study.
Supply of SCADA RTU Replacement at Jubail Commercial Port Substation, includes design, panel assembling, factory test, replacement engineering works, HW operational setup, developing configuration engineering and, testing & commissioning.
Expand the existing SCADA RTU at Qatif BSP by providing expansion kits, performing expansion engineering, HW installation, redeveloping configuration engineering and, testing & recommissioning.
Supply of New Redundant SCADA RTU at Ibn Zahar 230kV Substation, includes design, panel assembling, factory test, installation, HW operational setup, developing configuration engineering and, testing & commissioning.
Rendering re-configuration Engineering and testing & Commissioning Services at Eight(8) substations in SEC’s Dammam Operating Area.
Expand the existing SOER at Ghunan 380kV substation by providing expansion kits, performing expansion engineering, HW installation, redeveloping configuration engineering and, testing & recommissioning.
Our scope is limited to field and equipment interfacing engineering design, Supervision, testing and commissioning of 9 Meteorological Stations installed at 9 SCECO-East Power Plants. These stations measure wind speed, wind direction, ambient Temperature, relative humidity, atmospheric pressure and dew point
Expand the existing Harris Microplex 5000 SCADA RTU at South Hofouf 230/115kV substation by providing expansion kits, performing expansion engineering, HW installation, redeveloping configuration engineering and, testing & recommissioning.
Expand the existing SCADA RTU at Borshaid substation by providing expansion kits, performing expansion engineering, HW installation, redeveloping configuration engineering and, testing & recommissioning.
Expand the existing SCADA RTUs at all four(4) substations by providing expansion kits, performing expansion engineering, HW installation, redeveloping configuration engineering and, testing & recommissioning.